SOCAR KBR LLC
Job Title: Sr. Designer - Piping
Location – Baku
About SOCAR KBR LLC
In March 2015 the State Oil Company of Azerbaijan Republic (SOCAR) and KBR announced an agreement to establish a new engineering and support services company in Azerbaijan. The legal entity name of the new company is SOCAR-KBR LLC and provides design, engineering, technical, procurement, construction supervision and project management services for projects across the upstream, midstream and downstream oil and gas sectors, in the Azerbaijan – Georgia – Turkey (AGT) region. The key objective of this strong partnership is to create a world class Azerbaijan-based EPCm services company that will utilize the strength of both organizations and deliver top quality results by utilizing, developing and promoting Azerbaijani national content. The company has a long term commitment from both organisations.
ACE Project
The Azeri Central East (ACE) project is a new Production, Drilling, Quarters (PDQ) fixed platform located in the existing Azeri-Chirag-Gunashli (ACG) field within Azerbaijan’s territorial waters of the Caspian Sea. The new facility will complement existing West Chirag and ACG Full Field Development (FFD) production and will be located between the Central Azeri (CA) and East Azeri (EA) facilities in ~137 m water depth.
The ACE facility will include a mast equipment package drilling rig and a single, two phase, production train that will carry out gas / liquid separation and export comingled crude oil and produced water to the existing Sangachal Terminal. Separated dry ACE gas is compressed for injection into the EA crest, with excess dry gas exported to CA for further injection into the reservoir or exporting to the Sangachal Terminal. An interstage draw off from the gas injection compressor provides gas lift for the ACE wells. In addition, there are a number of brownfield topsides modifications to the existing ACG facilities associated with the ACE project. These include modifications on EA-PDQ, to provide spare power and the primary telecommunications link to ACE and on CA-CWP, to handle ACE export gas. The ACE Project is also delivering the Engineering to facilitate three phase separation and sand removal on CA-PDQ.
Primary Roles and Responsibilities:
Under general supervision, performs all conventional aspects of the functional area subject matter. Devises new approaches to problems encountered. Plans, schedules, and conducts work requiring judgment in the independent evaluation, selection, and adaptation of engineering techniques, procedures, and criteria. Performs work which involves conventional engineering practice but may include a variety of complex features such as conflicting design requirements, unsuitability of conventional materials, and difficult coordination requirements. Provides technical guidance to designers and less experienced engineers. The incumbent should be knowledgeable in all areas of the technology's activities in particular 3D modelling. Should be capable of developing plot plan arrangements and complex plant layouts. The incumbent would also ensure the execution of work in accordance with cost, safety, schedule, and technical goals; and is accountable for accuracy, estimates and forecasts, preparing status reports, schedule and risk evaluations, and impact studies.
Qualifications:
• Experience in AVEVA (PDMS) E3D and SUPPORTS modelling software;
• Major EPC background with minimum of 5 years’ experience in Process Plant Design;
• Preferred experience in similar overseas role.
Experience Required:
• Minimum of 5 years working on international Oil and Gas projects
CVs to be submitted to: [email protected]
(Please indicate the position “Sr. Designer - Piping” in the subject line of the e-mail).
"SOCAR KBR" işçi axtarır - VAKANSİYA
13:21